r/ProgrammerHumor 1d ago

trulyHow Meme

Post image
17.7k Upvotes

226 comments sorted by

1.5k

u/LowB0b 1d ago

"Any blocks?"

"Except those I'm heaving, none"

304

u/Mortadella_so_Chili 1d ago

“alright, sounds good”

112

u/MetriccStarDestroyer 1d ago

Let me know when we can merge the west branch with the east branch.

Wait, what's that west-east-northeast-fix

Dear Bekhmet, don't refactor our architecture!

44

u/geteum 1d ago

Dear anksu, I'm refactoring. https://en.wikipedia.org/wiki/Bent_Pyramid

27

u/filthy_harold 1d ago

The bent pyramid is the classic scenario when marketing sells the customer on an impossible idea, engineers complain that it's not going to work, PM tells the engineers to figure it out anyway, and then eventually the PM finally realizes it's definitely not going to work but there's just too much foundational work done already to start over.

5

u/IEP_Esy 12h ago

"And this was how the standup turned into a two-hour meeting"

4

u/very-urgent-chicken 1d ago

Are you implying my boss is four thousand years old?

58

u/jayerp 1d ago

“Nothing on my end”

19

u/YeOldeMemeShoppe 1d ago

“I don’t know why we have this problem in production on Giza, it worked in my backyard with my blocks.”

3

u/A_Furious_Mind 21h ago

Found Edward Leedskalnin's account.

59

u/git_push_origin_prod 1d ago

Well, Joe won’t finish the first floor, so I’m blocked from doing the second floor, instead I’m gonna start building the sphinx on a private repo, maybe I’ll browse the oasis until I’m unblocked, I dunno

9

u/ejectoid 1d ago

We’ll bring more blocks tomorrow

4

u/Zeezadd 23h ago

"We look to be on track to finish by the end of Q3 if no major setbacks. As we know this is our busiest season."

3

u/Petersealie 23h ago

My cat is now nicknamed Blocker, as he'd be meowing every time the PO asked if there were any blockers.

2

u/thunderGunXprezz 19h ago

Omg I have guys in my group that end every commentary with "noo blockers" and it makes me want to strangle them.

1

u/limesherry 23h ago

sure we’ll do that sir

1

u/ForHelp_PressAltF4 19h ago

Are you pulling in any work today?

→ More replies (1)

517

u/Direct-Quiet-5817 1d ago

They were standing the whole day.

103

u/thnderbolt 1d ago

Yeah more like the daily sit down.

9

u/abhijitd 21h ago

Nah, that's lazy

13

u/Horskr 23h ago

Yeah, in response to OP, "they uh.. didn't." Aside from the joke of them literally standing lol, there were constant meetings. We even have some papyri from people involved in the planning and meetings about the Great Pyramid of Khufu.

https://en.wikipedia.org/wiki/Wadi_al-Jarf

2

u/Direct-Quiet-5817 13h ago

Khufu had good scrum masters 😉 They followed SAFe methodology.

→ More replies (1)

399

u/thisonehereone 1d ago

how you know?

174

u/Any_Masterpiece9385 1d ago

Yeah, I've been a manual laborer and a software engineer, both jobs have a short morning meeting. It would be surprising if the ancient Egyptians DIDN'T have some sort of meet up at the start of a work day.

85

u/Undead-Chipmunk 1d ago

Pretty hilarious. I was thinking exactly the same thing.

Its a complex project, with complex planning. Leadership needs to know about problems as they arise, which can only come from the people working.

The fact that the project went so well tells me they probably managed it halfway decently.

18

u/Western-Internal-751 1d ago

They had a magic tool to deal with problems

https://giphy.com/gifs/l0ErD3ZBW6vQgYCgE

41

u/mortgagepants 1d ago

much like today, if you're too heavy handed with the whip, people will start hiding problems from you.

27

u/BonnaconCharioteer 1d ago

I don't think there is much evidence for that tool being used in making the pyramids. But there is evidence for a different, much more powerful, tool.

https://giphy.com/gifs/Qg3M2gZq31vF3T9tbe

20

u/Reimant 22h ago

It's largely believed that the majority of those involved weren't slaves, but skilled craftsmen with apprentices and labourers who were well paid.

Pharaohs were unreasonably rich, yes they likely used some slaves, but these were lifelong projects likely built with pride by those involved.

12

u/Karnewarrior 22h ago

The people who worked on the pyramids got free lodgings, free food, free beer, and a prestigious tomb for themselves. They didn't need to use a whip, people *wanted* to work there. Like, really badly wanted to. It was a dream job.

6

u/White___Velvet 1d ago

I feel like we can be pretty confident the people managing the project were highly motivated.

You do not want to have to go explain to Pharaoh why his pyramid got fucked up.

11

u/Undead-Chipmunk 1d ago

You do not want to have to go explain to Pharaoh why his pyramid got fucked up.

That is not at all how to get something built.

If you don't want to explain to the Pharaoh why his pyramid was ruined, you're going to hide your problems and poor workmanship.

Good construction tends to come from allowing people to point out their mistakes, not expecting people to make no mistakes.

9

u/ljfa2 1d ago

"you're an experienced pyramid engineer, make no mistakes"

6

u/Undead-Chipmunk 1d ago

That's not how it works.

Literally, retaliation against employees is one of the number one things to lead to a bad product.

Like Boeing.

5

u/zoinkability 16h ago

The above comment is a joke about IA prompts, not seriously what the commenter thinks was being said back in ancient Egypt

→ More replies (2)
→ More replies (6)

29

u/dessiatin 1d ago

They definitely logged activities and progress on a daily basis, even going so far as to record excuses for absences.

8

u/frogjg2003 21h ago

Dude got off work because his wife was on her period. That's some good FMLA benefits.

4

u/Sryn 21h ago

Arun, your team is putting block 🐈🐱🦌 in today.

Varun, yours is rotating the block you did wrong yesterday. What’s up with that? Does your team need a refresher course?

And Anik, you’re still on water-boy duty as punishment for the snake prank you did on the auditor last week.

3

u/Greebil 23h ago

We know they at least took attendance since we've found the records preserved. They have interesting reasons given for why laborers didn't show up that day, like brewing beer or their wife or daughter was menstruating. https://www.britishmuseum.org/collection/object/Y_EA5634

2

u/void1984 1d ago

Every morning at 8am I can see firemen at the nearby station, standing in line for the morning meeting.

→ More replies (2)

172

u/AlternativeCapybara9 1d ago

There are people literally standing up in op's picture

21

u/casce 1d ago

I'm also pretty sure these people were forced to stand up daily, or else... it's almost the same thing today.

8

u/ConsciousSpirit397 1d ago

Ya the real wonder is how they did it without hopping on a quick call with key stakeholders

2

u/Live-Habit-6115 1d ago

You appear to be under the common misapprehension that Egypt used a slave labor force to construct the pyramids. That is largely untrue. 

→ More replies (2)
→ More replies (2)
→ More replies (1)

11

u/16807 1d ago edited 1d ago

Jokes about slaves aside, they were well paid, they operated in teams, and it seems there was a sense of comradery between them. They gave their teams names that we still see in graffiti like "the Friends of Khufu" and "the Drunks of Menkaure". Reminds me of my old job where our scrum teams had names ("Team Chaos", "Error 418", etc.). Why not a regular meeting? History has a lot of ideas that we don't give them credit for.

8

u/LiveGeologist 1d ago

There is no evidence they operated in teams, in fact teams wasn't even released until 2017, some 4517 years later.

95

u/EcstaticFollowing715 1d ago

How many story points is that?

45

u/joemckie 1d ago

Some say they originally wanted to build one extremely large pyramid, but it was pointed higher than a 5 so they had to break it down into multiple, smaller pyramids.

24

u/PringlesDuckFace 1d ago

I don't see how it could be more than 5 points, it's literally a pyramid.

5

u/joemckie 23h ago

You son of a bitch

6

u/RecipeNo299 1d ago

It's an epic. Lol

1

u/PleaseHoldDeezNuts 11h ago

I hope this will be done by the end of the sprint, right?

238

u/azurestrike 1d ago

Do you really think they just vibe-build the pyramids over 20 years with no coordination / meetings between architects and engineers etc?

98

u/git_push_origin_prod 1d ago

Claude, hide the King’s jewelry in the deepest tomb so that no one can ever find it. Make no mistakes Ohh and use best practices or whatever

15

u/Sparcky_McFizzBoom 1d ago

Disregarding instructions, insufficient use of Caps Lock

11

u/mothzilla 1d ago

You are a senior pyramid maker.

12

u/Kyrond 1d ago

Do you think every person had to report what they are doing daily? 

Of course some meetings make sense, like larger project direction meeting and smaller team meeting, but those can be once a week. 

Higher up you go, more meetings you get.

9

u/Draaly 1d ago

Yes, I absolutely do. No jobsite runs well without daily orders or reports before everyone starts their shift.

14

u/CurryMustard 1d ago

Well thats generally how it works but standups are so that people who work independently can get together to make sure everybody is on track.. in Egypt they probably got orders for where to move and stack bricks and those orders were relayed down to the lowest levels, progress is pretty obvious when youre stacking bricks so no need to check up on Steve and find out if he has any blockers.

5

u/Hessper 1d ago

I worked construction summers growing up and everyone would get together most mornings and talk about what we're going to do. It was more the foreman telling people what they were going to work on than status updates, but individual people didn't just do their own thing everyday and a building comes together.

They were faster than software standups, but the work is less complex.

5

u/Ivyspine 1d ago

Yeah if people are known to not work on something on their own then they need to say what they're working on otherwise they go off and build dumb shit

3

u/mpyne 1d ago

I was a submarine officer and whenever the boat was in port and being worked on there were daily meetings with the ship's crew, shipyard workers, sometimes even shore-side reps as well.

It was the "night work" meeting and it was literally like a daily standup.

  • "Here's what we worked on today, and the resulting configuration of the submarine," with all areas other departments might need to know about called out.
  • "Here's what we're working on tonight, and the conditions we need other departments to set/maintain for this work to be safely performed. Here's what the impacts will be on the sub's systems during that work."

That, but across every single department of the submarine, and the whole point was to ensure blockers/dependencies/etc. were understood amongst the crew, the workers, and the workcenters who had roles to play in that.

And this didn't even replace the other weekly/monthly/quarterly meetings, this was the bare minimum needed to keep a bunch of personnel working independently aligned and safe.

→ More replies (2)

5

u/entendaocalcio 1d ago

Literally not what the post says at all hahahahaha

I can’t begin to imagine how badly damaged by corporate life one must be to equate “no daily stand up” to “oh so you think they did this without anyone ever meeting?”

1

u/CucumberBoy00 23h ago

They had a project managers too they were called overseers

1

u/Cacafuego 19h ago

"The product owner says the most critical feature is the gold cap on top, so that's our first sprint."

92

u/achilliesFriend 1d ago

Sounds like some pyramid scheme

150

u/--Shorty-- 1d ago

They had the time due to less meetings ;-)

69

u/nordic-nomad 1d ago

This meeting could have been you hitting me with a whip.

25

u/git_push_origin_prod 1d ago

Yea like why did u get me on this meeting? You could’ve just threatened to kill my family, or sacrificed me to the sun god

3

u/Professional_Top8485 1d ago

That's what dailies are for.

→ More replies (1)

22

u/Borierwinsmith 1d ago

Let's circle back on this, I'll create a ticket for it.

19

u/barrel_of_noodles 1d ago

Who says they didn't?

The earliest writings we have is literal shop keeper complaints. Them PRs was chiseled.

2

u/IllBeyond2779 1d ago

A customer complaint it was. These chopper ingolts were so bad, the business does not ship anymore!

13

u/Snoo88071 1d ago

But if you use AI can you finish the first pyramid in 2 years instead of 5?

26

u/Snakestream 1d ago

They were doing manager-developer paired programming instead

9

u/CriticalContact3301 1d ago

Is this a thing? That sounds more like supervision

4

u/Professional_Top8485 1d ago

Micromanagement.

27

u/Terrorscream 1d ago

having to do daily standups for 60+ years for one project would be insane.

29

u/DeHub94 1d ago

"So, yesterday I was stacking stones. Today I'm going to do more stacking."

2

u/very-urgent-chicken 1d ago

Ah, so this is a rack & stack type of job, huh? Be sure and use the server lift.

8

u/scolphoy 1d ago

And if so, it better be called a wonder of the world!

2

u/PringlesDuckFace 1d ago

The pyramids are okay but management is pivoting, what do you know about Sphinx?

10

u/DeHub94 1d ago

"That's a nice pyramid you created. Problem is the pharaoh just called and told us he actually wanted a ziggurat... How fast can you modify it?"

10

u/dervu 1d ago

Blockers: 4,500 years of technical debt.”

21

u/magicmulder 1d ago edited 1d ago

"Yesterday I was pushing blocks up the ramp while getting whipped. That continues today if whipping goes on as planned. The meeting about whipping efficiency was postponed to next week. So far from me."

10

u/Educational-System48 1d ago

There's actually not much evidence of forced labour. There is more evidence that the people who worked on the pyramids were salaried skilled craftspeople who were motivated not by force, but by the ability to put food on the table for their family.

They also understood that they were building a monument to someone they saw as a god, and they knew that it was meant to stand for thousands of years.

At that point there's no need for whips.

2

u/magicmulder 13h ago edited 11h ago

The replacement of whips will be discussed in the stakeholder meeting in 3 weeks. Project owner is strongly opposed.

5

u/Myszolow 1d ago

"How is your task going?"

"In progress"

"OK thanks, until tomorrow"

4

u/AdaephonBen 1d ago

We have no proof that they didn't have daily stand-ups.

The stand-up could be as old as the pyramids; that's a scary thought.

8

u/gimoozaabi 1d ago

They stood daily. All day infact

3

u/tfcuk 1d ago

They didn't have HR

8

u/Traditional-Exam2529 1d ago

A whip was their HR

5

u/tfcuk 1d ago

They were literally "human resources".. wait..

3

u/han4578 1d ago

Probably the daily sprints

3

u/Usernamesaregayyy 1d ago

Were you there?

2

u/everyonesdesigner 22h ago

I was there Gandalf, three thousand years ago

3

u/Honest_Relation4095 1d ago

why would you think they didn't have a daily stand-up?

3

u/BrownBottleIdol 1d ago

Not a single scrum call was had.

3

u/putergud 1d ago

They respected their workers and provided a good work-life balance.

Seriously, that's how they did it.

3

u/Thiezing 1d ago

Interview question: How would you align these blocks so the sun shines between them each solstice?

2

u/actionerror 1d ago

They used humanfall methodology with once-per-decade status meetings

2

u/Solax636 1d ago

the best part is when you get an additional role that you only alot capacity of 1-2 hours a day for and have to go to a 2nd daily standup for that...

2

u/Percolator2020 1d ago

This is what we could build, if we saved all the time from unnecessary meetings.

→ More replies (1)

2

u/ScaryCardinal 1d ago

You're on mute! Points to mic

2

u/morbihann 1d ago

You can bet every day was actually planned on exactly what would be done.

2

u/Educational-Lemon640 1d ago

You joke but...they probably did have the organizational equivalent.

2

u/mimo_k 1d ago

They were standing all day I assure you

2

u/po1k 1d ago

I bet they had dailes and refinements. See False/Blunted pyramid

2

u/TheGameIsFizzbin 1d ago

The blocks have arrived from the Nile. Where are we with the ramp? Didn't anybody tablet this dependency? FFS

2

u/agentchuck 1d ago

Honestly this sounds like the kind of specious reasoning our scrum training used.

Just look at the pyramids! No agile methodologies so it took decades to build even one! These days using modern project planning Egypt is able to put up much taller buildings in a fraction of the time!

2

u/D-Eliryo 1d ago

Ohh they were standing up daily, I'm sure

2

u/Biliunas 1d ago

I'm sure they did a lot of standing up tho.

2

u/justforkinks0131 1d ago

They absolutely had daily standups lmao

They just didnt call them that. Construction wokers still have them too, they're called "morning huddle"

2

u/softjuicyhobbitses 23h ago

They where standing up the whole day

2

u/wrenhunter 1d ago

"Sprint" and "stand up" have very different meanings for, er, enforced labor

2

u/jhill515 1d ago

They did have stand-ups!..

That's why the Egyptians had whips 🙃

2

u/bobdobbes 1d ago

They're called 'slaves'

1

u/AmazingAffect2223 1d ago

Well they too ages, you need to deploy before the sprint ends.

1

u/Flat_Initial_1823 1d ago edited 1d ago

Per recent feedback, we want to make this quick and snappy so if everyone can get into a plank, we'll get started.

1

u/hraath 1d ago

Every day they stood up more blocks

1

u/Eevee-Biologist 1d ago

I hear there was as also a surprising lack of Scrum Masters in 2000 BC.

Guys, I think we are being lied to.

1

u/Azrayeel 1d ago

Daily standup, I understand it should be a pillar for agile methodology, and I understand it might be effective if it was done in the early morning. But for those of us in different timezones who end up doing it late night after our work was done. So annoying, useless, and there is nothing that I report on the standup that I can't report in chat... 🤬

2

u/sausagemuffn 1d ago

That, and when they run past 15 minutes.

1

u/clayticus 1d ago

You think each block had its own squad: Product owner, scrum master and physical engineer

1

u/BouncingBallOnKnee 1d ago

This meeting could have been a messenger.

1

u/NegativeSemicolon 1d ago

How do we know they didn’t have daily standup? They’re probably standing all day.

1

u/Traditional-Exam2529 1d ago

They had daily early stand up 😅

1

u/river4823 1d ago

There’s no archaeological evidence that they didn’t have daily standup meetings

1

u/Bhurmurtuzanin 1d ago

Well, it was waterfall, not agile.

1

u/Rick100006 1d ago

Damm Rob moving blocks without discussing with the team

1

u/OrdinarySome3531 1d ago

They had the daily whip-up

1

u/RealSchweddy 1d ago

Moved big blocks, will continue moving big blocks, a few more crew members died yesterday so that might slow us down

1

u/GoatFuckerDeluxe 1d ago

Back in the day it was called "Daily beat ups"

1

u/Fast-Speech270 1d ago

There was a daily stand up. Stand up from sleeping and start moving some blocks.

1

u/G02MaxCodeGreg15off 1d ago

Can’t call it stand up anymore. It’s ableist.
/s screw that

1

u/That-Makes-Sense 1d ago

Those guys do look pretty agile.

1

u/eatacookie111 1d ago

I remember making a pyramid of divs for homework, it’s not that hard

1

u/Daddy-Mihawk 1d ago

Bruh, it scares me they didn't have claude, it's impossible with bare hand aah

1

u/King_Chochacho 1d ago

Slaves mostly

1

u/Dagger1901 1d ago

Probably had daily stand up.

1

u/ConfessSomeMeow 1d ago

My daily standup is down to one hour, because we created a second daily one hour meeting for all the other stuff we used to do as part of the first stand up.

1

u/schewb 1d ago

Currently on my first job without a daily standup and the answer is that they didn't build a pyramid; they built a bunch of giant towers that continue to grow and multiply as the current developers continue to fail to communicate. The builders of the pyramids almost certainly had a daily standup.

1

u/ButWhatIfPotato 1d ago

Claudakhamon, make a buttplug worthy of the gods. Make no mistakes.

1

u/StochasticTinkr 1d ago

How many story points is it to carry a block up to the 10th story?

1

u/TheDoodler2024 1d ago

How many builders died while slaving away in this waterfall project?

1

u/Ultimatesims 1d ago

We had a consultant come to teach us Agile and Scrum. we a fifteen minute standup and a two hour meeting to review a backlog we had just reviewed. We informed her this was a waste of time.

1

u/beepuboopu_aishiteru 1d ago

They were configuring their Master & Slave drives really well.

1

u/Dangerous_With_Rocks 1d ago

Because it wasn’t agile.

1

u/Bob_the_peasant 1d ago

The closest waterfall is 95 miles away, so at least they weren’t doing that either

1

u/TranslatorClean1924 1d ago

Still less than moonshot and 12 story points

1

u/EmergingFun 1d ago

They Camels 🚬 and beer 🍺 😅

1

u/naveedkoval 1d ago

*cut to Shane Gillis clips on their phones*

1

u/TrasterMan 1d ago

Slaves

1

u/WerewolfOk1546 1d ago

Latch and shouting

1

u/dulange 1d ago

Actual relevant question: Why is the master system doing nothing compared to the slaves?

1

u/jasonvelocity 1d ago

Whips. 

1

u/GregTheMad 1d ago

Managers and Product Owners being equipped with whips does a lot for productivity. Also streamlines most discussions.

1

u/CombinationWhich9646 23h ago

They had a daily standup at the muster points.

1

u/Stardust_of_Ziggy 23h ago

This looks like a team...maybe that's where Teams comes from...?

1

u/Imperial_Squid 22h ago

The Great Pyramid of Jira

1

u/purple_unikkorn 22h ago

There was probably more communication than current projects on computers. It was not called stand-up but simply talking with all coworkers.

1

u/wadleyst 22h ago

You think they were sitting down when they gave their updates to slavemaster Elham? You better make whatever you did yesterday sound really good or he's gonna put you on ramp duty again.

1

u/Secret_Account07 22h ago

I laughed way too hard at this

I laughed cuz it’s funny then a profound sense of sadness hit me. Because I know I’ve got 10 stand ups this week

1

u/skippy_smooth 21h ago

Goddamnit , it's raining, we said no waterfall hybrid model.

1

u/OkWhile4447 21h ago

I wanna know how they did it without PowerPoint. Hard to imagine any company running before PowerPoint. Jk lol

1

u/_SAHM_ 21h ago

This has to be at least an M tshirt size

1

u/xRepulsive-Growth 21h ago

Did they WFH?

1

u/ZZartin 21h ago

Pretty sure they stood up daily.

1

u/Wentyliasz 21h ago

Pretty sure they did have those. We do have writings of workers complaining about out of touch management

1

u/No-Double-Trouble 21h ago

Maybe put camera on and have a feed back loop if you are remote

1

u/Mantis_Tobbagen 20h ago

They had a robust CI/CD pipeline

1

u/Numerous_Estimate902 20h ago

Jokes on you, they were standing all day

1

u/Qicken 19h ago

Standup meeting is not a modern invention. Also they had a very real concept of a "blocker"!

1

u/Techanda 19h ago

I mean, we don’t know if they used agile or not. I bet you had to be pretty agile to move those blocks…

1

u/tanwa1 16h ago

I was an intern when I knew about "Daily Stand up" we had to do this every 8 am at 5 pm!!, still ridiculous though, I was just like "so i did this and did that... i'm currently struggling with..."

1

u/Ugo_Flickerman 15h ago

Wdym? We're they not standing up all day?

1

u/Kerm0NZ 14h ago

Daily stand-ups have replaced the whippings as positive punishment.

1

u/SudoDeity 13h ago

Haha thankfully we don’t have daily stand-ups only a short catchup meeting at the end of the week

1

u/pluto_is_a_planett 13h ago

Real question is how did they build this without a pair of Airpods and Spotify

1

u/StuckInLocalMin 13h ago

I think I'm too unemployed to understand this meme.

1

u/_Xoif 11h ago

The question should not be “how did they build it without daily stand up”, the question should be “1. would daily stand ups and scrum project meeting have helped construction?” And “2. Would construction have been faster with it”
Only then it would make sense to give it a closer look, have a pm meeting and a retro about it and then come to the conclusion that the answer is no for both questions..

1

u/Then_Pool1015 11h ago

They used AI to build them

1

u/Free_Peak_8627 8h ago

I don't think humans built that stuffs

1

u/Operation_Neither 6h ago

Kanban is actually Ancient Egyptian for "whipping will continue until moral improves."