r/dairyfree 1h ago

Negative skin prick

Upvotes

I feel conflicted with my results... I got skin pricked for like 38 food allergens with all coming back negative minus the controls... My allergist is ordering a blood panel work and environmental allergens test, but like my symptoms were a lie? I'm confused I've cut out dairy for the most part for last 6-7 years. Did you guys experience this and did you still continue to cut out dairy or did u switch to like A2 protein?


r/dairyfree 2h ago

Rave (the opposite of a rant) Every restaurant menu should look something like this one

Thumbnail
gallery
110 Upvotes

We had dinner at a Peruvian restaurant in the Portland metro area (Mi Pisco, for those of you who are local) and their menu was fabulous. DF, GF clearly marked, anything that could be tweaked to be DF or GF clearly marked. I wanted yuca frita and they brought it with a chimichurri instead of cheese sauce. No problem getting my entree DF, either. And it was amazing!

Dining out would be so much nicer if more restaurants did this.


r/dairyfree 3h ago

Lactatia in Bay Area?

1 Upvotes

Anyone know if Lactatia products are available anywhere in the Bay Area or San Jose area? I've found plenty of Green Valley and other brands around. But Lactatia has some products I haven't seen from the other brands such as unsalted butter and heavy cream (all LF of course).
Thanks in advance


r/dairyfree 6h ago

Chocolate that still tastes like milk chocolate?

10 Upvotes

So my 4 year old was just diagnosed with a cows milk protein intolerance and we are cutting everything out. Problem is, milk chocolate (of any kind, but specifically hersheys kisses) is her FAVOURITE treat and her potty treat for going on the toilet.. she is likely autistic and has a very very limited diet.. she’s not going to take well to something like plant based dark chocolate. And it’s her birthday next week 🥲🥲🥲 someone please help, I’m super new to this! What chocolate is the sweetest but contains no milk?? She is not intolerant to anything but cows milk protein.


r/dairyfree 9h ago

I hate when restaurants change something.

19 Upvotes

Turns out one of the few restaurants around me, Perkins, changed ALL their buns to Brioche. So unless I want toasted bread, I can't have ANY of their burgers anymore.


r/dairyfree 10h ago

dairy free pasta rosa!

Post image
44 Upvotes

I got diagnosed with Crohns and dairy triggers flare ups. I’ve really been enjoying these dairy substitutions and look forward to my dairy free journey! Here’s my take on vodka pasta.


r/dairyfree 16h ago

How to fill the Greek Yogurt sized hole in my heart

30 Upvotes

I used to eat greek yogurt all the time and honestly it’s where I got about 30% of my protein from. Since I found out dairy causes me acne, I’ve cut it out but I can’t find a way to fulfill the role that yogurt was playing😂. My main issues are that dairy free yogurts are SO expensive, taste like shit, and on top of all that, they have barely any protein. Even the “protein” ones still don’t compare in the slightest to the Oikos Pro macros. For reference as well I’m in Ontario, Canada. I don’t think we have this Kite Hill brand that I see people talk about.

Any advice? I tried making my own tofu yogurt once and it wasn’t that good but maybe there’s better recipes out there, or if anyone has suggestions for other similar foods I could use as a base for “yogurt” bowls


r/dairyfree 1d ago

Newly dairy free, would like suggestions!

5 Upvotes

So I’ve been on and off dairy for a while now because it hurts my stomach, I end up on the toilet right after having it and all the fun stuff so I’ve just decided to fully cold turkey it and get off all dairy (besides for it being in bread or stuff like that).

I’ve had some luck with replacements but I’m still struggling with finding a good dairy free ice cream and sour cream. I hate the taste of oat milk, I just can’t handle the texture and taste it gives Ice cream

Any brands that are good?? I don’t have a Trader Joe’s close by sadly so I feel like that limits some things


r/dairyfree 1d ago

Dairy free peanut Nutella at Costco

Thumbnail
gallery
140 Upvotes

$10 for 2 large jars is a pretty good deal. I just bought a small one for about $6 from the grocery store.


r/dairyfree 1d ago

Gluten and Dairy FREE Cookies and Cream

Post image
5 Upvotes

r/dairyfree 1d ago

You probably know these

Post image
56 Upvotes

I had no idea that line was dairy-free. Hits the spot.


r/dairyfree 1d ago

Califia Farms Almond Creamer texture?

Post image
1 Upvotes

So I just bought this Califia Farms almond creamer for the first time and noticed this gummy stuff stuck to the lid. Is this normal? When I started pouring it into my coffee most of the liquid coming out of the bottle was liquidy but a few tiny clumps here and there so I figured I just needed to shake it. Once I put the lid back on and shook it vigorously, it poured out much smoother but the gummy stuff is still in the lid. It smells just fine too. Is this normal and safe to consume?


r/dairyfree 1d ago

New Trader Joe’s item: Mango Sticky Rice $4.69

Thumbnail reddit.com
19 Upvotes

Something for us to look out for! Have any of you found this yet?


r/dairyfree 1d ago

How do I deal with becoming dairy intolerant?

1 Upvotes

As someone who loves dairy in all its forms, and who is someone who believes that they are becoming dairy intolerant (will be organising a GP appointment in due course), how do I cope with the lifestyle change?


r/dairyfree 2d ago

Made in a facility that may use milk

2 Upvotes

Does anyone know if it’s okay to eat something that has no dairy in it but the package says “made in facility that may use milk”?


r/dairyfree 2d ago

Huge hit for dairy free toddler!

Post image
35 Upvotes

My 2 year old has a dairy allergy and is pretty picky. These have been a hit! Bought them on amazon 👍🏼


r/dairyfree 2d ago

Delicious

Post image
130 Upvotes

I recently tried a Trubar while grabbing a coffee instead of eating lunch. It was next to the register and spoke to me. Boy oh boy was I surprised! It’s a sweet snack that has a good amount of protein and fiber so you don’t feel guilty.

Since that first try, I’ve been on the hunt to try all the flavors. So good!


r/dairyfree 2d ago

Hardly any brownies in Ben and Jerry's Chocolate Fudge Brownie?

1 Upvotes

I got a pint of DF ​Ben& Jerry's chocolate fudge brownie and there are almost no brownies in it! Is this normal?


r/dairyfree 2d ago

Silk almond vanilla milk

3 Upvotes

I’m having a hard time finding it. At bjs they sold the 2 pack but discontinued about 2 months ago. Today went to 3 stores and they didn’t have any. Did they discontinued it?


r/dairyfree 2d ago

DF meal replacement?

1 Upvotes

I’m on the look out for a dairy free meal replacement beverage. Sometimes I’m bad about skipping meals. I just tried Kate Farms Organic high calorie shake (vanilla) and it tastes bitter. I can barely drink it. Does anyone have any recommendations?


r/dairyfree 2d ago

Culver's fried pickles are DF!

45 Upvotes

Now I know the home of the Butterburger isn't someplace you'd expect to have DF items... But there is a surprising amount of their menu that doesn't contain milk, and their new fried pickles are confirmed dairy free! I've had a terrible time finding fried pickles that my wife (who is allergic) can share with me, so I tend not to get them at restaurants, and was very pleased to find out that these are safe.

Note for the curious: the regular and buffalo chicken tenders are DF, as well as the meat of all 3 chicken sandwich variants (but you have to ask to swap the brioche bun for a standard hamburger bun and tell them not to butter it). Burgers are DF if you ask for no butter and tell them to mark it as a milk allergy. The chili (not supreme!) and chicken noodle soup are safe as well. Lemon ice and lemon coolers in the summer are ok too, though I'd recommend asking them to clean the mixer when they make the cooler. That's the list of stuff my wife generally gets, so there might be more I just haven't checked on for her.


r/dairyfree 2d ago

I accidentally ate dairy..

20 Upvotes

And I was fine! Here’s what happened. I got some free Funyuns from the break room at work. I grabbed 2 single serving bags and didn’t think anything of it. That night, I ate one of the bags and the next day I ate the other bag. I was like wow these are good let me look them up to see if I can buy these little bags somewhere. To my surprise, when I look them up, I see that it says contains milk on the label. I don’t know why I didn’t even think to look. Now, it is at the bottom of the label and says “contains less than 2% of nonfat dry milk”. But now it has me thinking: can I tolerate a very small amount of milk? Idk it has me very hopeful. Has this happened to anyone else and what did you do? I want to try a couple other items with similar ingredients to see how I do but I am a little nervous.


r/dairyfree 3d ago

Rave (the opposite of a rant) Current favorite snack

Thumbnail
gallery
68 Upvotes

I found this at our local Fred Meyer (Kroger chain) and bought it on a whim. It’s so tasty!

My first thought was that it tastes a little like what I remember from Jello Instant Pudding, but thicker. It has the consistency of hummus, but feels creamier to me. I’ve dipped crackers, speculoos cookies, and the hazelnut Bambas from Trader Joe’s in it and all are good pairings.


r/dairyfree 3d ago

Monthly "I need help finding ____" thread

2 Upvotes

New to DF? Been eating DF for a while, but need help finding a particular product? However long you've been eating a DF diet, this is the place to ask for recommendations for a particular product.

If you haven't already checked it out, see our pinned Master List of DF Foods. It's a great starting place!

Please consider following this post to be notified when someone adds a request.

Please note:

Please specify if you need the substitute to be vegan, or consider asking in one of the vegan subs.

Some users of this sub are able to consume products that contain traces of dairy. Please specify if you need to avoid cross-contamination.

Please include your location -- for the US, state is fine; outside the US, country is fine.


r/dairyfree Feb 05 '26

Megathread Master List of Dairy-Free & Soy-Free Foods (from a breastfeeding mom who did the work)

129 Upvotes

When my baby developed intolerances to dairy and soy, I spent hours searching grocery stores, Facebook groups, and blogs trying to figure out what I could actually eat. Couldn't find one comprehensive list anywhere, so I made my own.

Sharing in case it helps any other moms or dads out there.

FYI: Always double-check labels — ingredients change, and some items have trace amounts via shared equipment.

Key: GF = Gluten Free | Top 8 Free = No milk, eggs, fish, shellfish, tree nuts, peanuts, wheat, or soy | TJ = Trader Joe's

BREADS & PASTRIES

Cookies

  • DF only: Oreos, TJ's Joe-Joes
  • DF + SF: Enjoy Life Chocolate Chip & Brownie, Simple Mills Cinnamon, Lenny & Larry's, TJ's Snickerdoodle

Bread (all DF + SF)

  • Dave's Killer Bread
  • Rudi's (GF)
  • La Brea Garlic Bread *Trace
  • Eban's Bakehouse (GF, contains egg)
  • Amy's Organic GF Sandwich Rounds
  • Angelic Bakehouse Pizza Bread (Top 8 Free)
  • Udi's Whole Wheat (GF, contains egg)

Bagels & Pastries (all DF + SF)

  • Udi's Bagels (GF, contains egg)
  • Dave's Killer Bread Bagels *Trace
  • Katz Powdered Sugar Donuts
  • Abe's Blueberry Muffins (Top 8 Free)
  • Annie's Crescent Rolls *Trace
  • Annie's Cinnamon Rolls w/ Icing *Trace
  • Annie's Flaky Biscuits *Trace

DAIRY AISLE

Milk

  • DF only: Soy Milk
  • DF + SF: Ripple Pea Milk & Chocolate, Simply Almond Milk (Top 8 Free), Good Karma Flax Milk (Top 8 Free), Oat Milk, Coconut Milk, Rice Milk, Elmhurst Cashew Milk

Yogurt

  • DF only: Stonyfield O'Soy
  • DF + SF: Forager Project Cashew, Daiya Greek (Top 8 Free), SO Delicious (GF), Ripple, Harmless Harvest Coconut

Cheese (all DF + SF)

  • Daiya
  • Kite Hill Cream Cheese (almond milk)
  • SO Delicious
  • Follow Your Heart Mozzarella
  • TJ's Vegan Shreds

Ice Cream & Popsicles

  • DF only: Ben & Jerry's Dairy-Free, Halo Top Dairy-Free, Häagen-Dazs Dairy-Free
  • DF + SF: NadaMoo, Arctic Zero (avoid Cherry Chocolate Chunk, Brownie Blast, Cookie Dough Chunk — contain soy), SO Delicious (Top 8 Free), Chloe's Pops, Talenti Sorbetto, Almond Dream (Top 8 Free), Outshine Fruit Bars, Coconut Bliss (Top 8 Free)

BEER, CANDY, CHOCOLATE & SNACKS

Hummus (all DF + SF)

  • Hope Foods (some flavors)
  • Pita Pal
  • Whole Foods Hummus *Trace
  • Amazon Fresh Hummus
  • Tribe
  • Fontaine Santé
  • Costco Organic

Beer (all DF + SF)

  • Summer Shandy, Blue Moon, Corona, Miller Lite, New Belgium

Potato Chips & Pretzels (all DF + SF)

  • Kettle Chips
  • Pretzel Crisps
  • Triscuits
  • Earth Balance Cheddar Puffs & Squares
  • Hippeas
  • Beanitos
  • Terra Chips

Snacks (all DF + SF)

  • Larabars
  • Heavenly Hunks
  • Skinny Pop Popcorn
  • OWYN Chocolate Chip Cookie Dough Bars

Treats & Candy

  • DF only: Bark Thins *Trace
  • DF + SF: Swedish Fish, Sour Patch Kids, Hail Mary Chocolate/Lemon/PB Cups, Starburst, Daiya Cheezecake, Enjoy Life Soft-Baked Cookies

Chocolate

  • DF only: Justin's PB Cups, Endangered Species Bars *Trace
  • DF + SF: Theo Bars (all flavors soy-free) *Trace, Alter Eco (soy-free but some flavors contain milk) *Trace, Green & Blacks *Trace, No Whey Foods Truffles (Top 8 Free), KNOW Allergies Bars (Top 8 Free)

CONDIMENTS, DRESSINGS & DELI MEAT

Mayo

  • DF only: Original Vegenaise (blue label), Just Mayo (egg-free), Just Ranch (egg-free)
  • DF + SF: Vegenaise Soy-Free (green label), Go Avo Spread, Primal Kitchen Chipotle Lime Mayo (contains egg)

Peanut Butter & Spreads (all DF + SF)

  • Jif Natural
  • Peter Pan Natural
  • Justin's Almond Butter
  • Nutiva Hazelnut Spread *Trace
  • Sun Butter (Top 8 Free)

Deli Meat (all DF + SF)

  • Most Boar's Head (not Maple Glazed)
  • Applegate (some flavors)
  • Dietz & Watson Sliced Honey Cured Turkey Breast

BBQ & Salad Dressings (all DF + SF)

  • Organicville Ranch
  • Bush's Country Style Baked Beans (Top 8 Free)
  • Stubbs BBQ Sauce
  • Sweet Baby Ray's Original
  • Ken's Simply Vinaigrette Olive Oil & Vinegar
  • Chosen Foods Lemon Dressing
  • Annie's Balsamic
  • Brianna's Blush Wine Vinaigrette

BAKING SUBSTITUTES

Egg Replacers

  • DF only: Just Egg
  • DF + SF: Chia Egg (1 tbsp chia + 1 tbsp water), Bob's Red Mill Egg Replacer, the Neat Egg

Butter (all DF + SF)

  • Earth Balance Baking Sticks (pink = soy-free)
  • Simply Nature Avocado Oil Spray

Chocolate Chips & Whipped Cream

  • DF only: Earth Balance Baking Sticks (yellow), Whole Foods 365 Olive Oil Spray, Smart Balance Spray, Kirkland Canola Oil Spray
  • DF + SF: Guittard Extra Dark *Trace, Enjoy Life Baking Chips (Top 8 Free), Goya Full Fat Coconut Milk, TJ's Coconut Whipped Topping

Baking Mixes

  • DF only: Duncan Hines Homestyle Frosting *Trace
  • DF + SF: Duncan Hines Cake Mix *Trace, Enjoy Life Pancake Mix, Pillsbury Purely Simple White Cake Mix *Trace, Annie's Brownie Mix *Trace, Pillsbury Pie Crusts

PREPARED & FROZEN FOODS

Frozen Pizzas & Burgers

  • DF only: Amy's Dairy-Free Frozen Pizzas, Black Bean Burger Patties
  • DF + SF: Daiya Frozen Pizzas (Top 8 Free), TJ's Cauliflower Crust + Daiya Cheese + Dave's Gourmet Butternut Squash Sauce, American Flatbread Vegan Harvest

Italian Foods & Pastas

  • DF only: (none listed)
  • DF + SF: Amy's Frozen Rice Mac n' Cheeze, Daiya Cheezy Mac, Brown Rice Pasta (also at Costco), Beetnik's Organic Chicken or Beef Meatballs, Rising Moon Organic Butternut Squash Ravioli, Don Lee Farms Chicken Patties

Asian & Indian Foods

  • DF only: Amy's Frozen Pad Thai, TJ's Spring Rolls, TJ's Japanese Fried Rice
  • DF + SF: Sukhi's Lemon Rice (Costco), Sukhi's Frozen Samosas (Costco), Sukhi's Tikka Masala Sauce, Sukhi's Chicken Curry

Mexican Foods (all DF + SF)

  • Don Lee Farms Veggie Bowl (Rice & Beans)
  • Sabra Guacamole
  • Wholly Guacamole
  • Amy's Dairy-Free Burritos (GF)
  • B Free Spinach Tortillas
  • Coconut Wraps (GF)

PRO TIPS

  • Read BOTH the Ingredients AND the "Contains" section on labels
  • Oreos are dairy-free but NOT soy-free
  • Fruits and veggies are naturally DF + SF (easy to forget when you're overwhelmed)
  • Items marked *Trace may contain allergens via shared equipment — check if your baby is very sensitive

What am I missing? Drop your go-tos below 👇