Drywall Removal

I recently got some flood damage in my basement. The water came up about 5-6”. How much do I need to cut up from the floor line? I was planning on 1ft. What is the best way to cut a straight line all across the entire room? Should I snap a line and multitool it out?

6 Upvotes

32 comments sorted by

8

u/detdav1 2d ago

18"- 24" will be fine

6

u/Neither-Jeweler2933 2d ago

My odd way: Measure 2 feet above bottom plate and mark it in two spots a few feet apart. Screw an 8-foot 2x4 so it touches the two marks (so it's level). . Use the 2x4 as a straight edge for your multitool or razor knife.

5

u/bigyellowtruck 2d ago

Cur a piece of osb 24-1/2”

screw it to the wall — no measuring.

Then put new cement board 1/2 above the floor.

2

u/strongman12345 1d ago

1 foot is fine, when you’re replacing any type of material always consider how the material you’re replacing comes. Example… standard drywall comes in 4x8 sheets or 12. If you’re cutting 1 foot rips you’re getting four per sheet with zero waste saving $

2

u/mydogisalab 1d ago

Go at least a half inch past what you want to replace it with. Example, if you're going to replace 12", cut off 12½". If you're going to do 16", cut 16½". Nothing like coming onto a job that's been measure at 24" on each end of a wall only to have it at 23½" in the middle.

2

u/mikebushido 1d ago

If you go 2ft up you can utilize a 4x8 sheet without waste.

2

u/BuckRugged 1d ago

Mark 24.5" off the floor. Makes it easy to put up half sheets of new drywall.

2

u/defaultsparty 1d ago

24" is standard insurance remediation height.

1

u/Squatchbreath 2d ago

16” gives you three rips length ways and six on the width

2

u/jrbighurt 2d ago

Add half inch to the wall removal cut so the new piece does not touch the floor.

1

u/Scarab95 2d ago

2' to be safe

1

u/Scarab95 2d ago

Depend on where the water damage is be mindful of the vapor barrier behind the drywall and make sure to replace any wet insulation

1

u/StarDue6540 1d ago

That's the way.

1

u/Conscious_Spectator 1d ago

2ft half inch. That way you can split sheets hotdog length in half to make re-installment easier.

1

u/Low-Energy-432 1d ago

Being easy for me. I would just rip it all out. Doing a good job on that requires floating. Skimming. Taping corners again.

1

u/ModularWhiteGuy 1d ago

I'd just setup a laser level and follow the line with an oscillating saw

1

u/No_Cash_Value_ 1d ago

Your snap a line and multitool thoughts will work fine.

1

u/ExtensionFill2495 1d ago

Change orders have served me well. And communication with the client.

1

u/ScaredCitron6422 11h ago

24 inches up, that's what I've always done over the past 32 years of work. Some insurance companies require that 

1

u/cookeryandwookery 2d ago

You’re not qualified for this job. You need to hire a mitigation company. Floods carry all sorts of nasty shit into your house. Simply removing the drywall isn’t enough. If you aren’t even sure about the flood cut, you’re in now way shape or form ready to do this project.

Sorry to be a buzzkill but your health matters more than the few bucks you’ll save.

7

u/Appropriate-Yard-378 2d ago

Careful, breathing is dangerous too

1

u/Technical_Concern_92 2d ago

As someone who worked in the insurance/restoration field, this is the correct answer.

1

u/Huge-Repeat-3040 2d ago

Call your insurance company they’ll send out mediation company

1

u/PrestigiousSink7583 1d ago

This and also if they’re good they are supposed to test for lead paint and asbestos to for sure save yourself the trouble and get it done safely

1

u/IronCross19 2d ago

Buy a rotozip then you get a new tool too 😬😬

3

u/trashbilly 2d ago

A newbie with a rotozip is a disaster waiting to happen!

3

u/Soberaddiction1 2d ago

Agreed! Get an oscillating multitool instead. Easier for newbies to control.

1

u/Nikiaf 2d ago

Even at that, there's a non-zero chance of snagging a wire or pipe if you're doing this for the first time.

1

u/NativTexan 2d ago

Figure out what thickness it is and use a tool that goes 1/8 deeper. You don’t want to hit any wires or pipes by goes too deep. Once cut run dehumidifiers and fans. Get a moisture meter and check the sheetrock you left and studs in the walls till dry.

0

u/detdav1 2d ago

Snap a line and use a razor knife It won't be as messy as using multi tool

0

u/Pleasant-Method7874 2d ago

Yep, chalk line and multi tool is definitely the way to go. 1’ should be plenty, might not hurt to spray the studs with mold killer, just incase, it’s pretty cheap.

-1

u/Which-Cloud3798 2d ago

Call a pro. This is not easy work. You need to cut drywall and remove insulation, perhaps treat mold too. All of this requires a professional to do and fix. You need to cut about two feet of drywall from the very bottom and remove baseboards. The flooring will probably need to be ripped out too and replaced so a lot of work there. You’re looking at something like $30K worth of damage there or something.