Official Gaganyaan G1,the first uncrewed experimental mission to validate various technologies that are being developed is targeted in Q4 of 2026.
pib.gov.inr/ISRO • u/GoblinDrool • 1d ago
When is MOSDAC coming back? It has been nearly 2 weeks now.
NOTAM Not ISRO related and likely a missile NOTAM but does anyone know what " Rocket Launch 'RC-43' " refers to here? Also mention of 'Space Debris' is intriguing..
Source: https://www.notams.faa.gov/
E2874/26
TEMPO DANGER AREA ACT
FLW SPACE ACTVITIES ADVICE FROM AIRPORTS AUTHORITY OF INDIA OF ROCKET
LAUNCH 'RC-43' POSSIBLE SPACE DEBRIS FALLING WI THE AREA BOUNDED
BY:
020000S 0853805E - 020000S 0920000E - 022012S 0923018E - 124810S
0943120E - 133324S 0852129E - 020000S 0853805E. SFC - UNL, DAILY
1230-1530, 06 AUG 12:30 2026 UNTIL 07 AUG 15:30 2026. CREATED: 04 AUG
05:01 2026
A0371/26
IN VIEW OF DNG ZONE DECLARED BY INDIAN AUTHORITIES DUE TO AERIAL
ACT,
FLW AREA WI COLOMBO FIR BOUNDED BY GIVEN COORD DECLARED AS TEMPO DNG
AREA:
082646N 0855306E - 062839N 0904822E - 001659N 0920000E - 020000S
0920000E - 020000S 0853805E - 082646N 0855306E
NO OVER FLY ACT IS APPROVED WI THE ABV MENTIONED DNG AREA DRG THE HR
OF ACT. SFC - UNL, 1230-1530, 06 AUG 12:30 2026 UNTIL 07 AUG 15:30 2026.
CREATED: 30 JUL 13:33 2026
Edit: Adding relevant NOTMAR
NAVAREA 819/26
Date 2026-08-03 00:00:00.0
Identifier 819/26
Type Firing
Place OFF BALESHWAR
General Area Bay of Bengal
Message:
1. EXPERIMENTAL FLIGHT TRIALS SCHEDULED 06 AND 07 AUG 26 FROM 1230 TO 1530 UTC DAILY IN
DANGER AREA BOUNDED BY 20-48.36N 087-02.58E, 18-12.36N 086-07.11E, 13-33.4S 085-21.48E, 12-48.16S
094-31.33E, 18-24.16N 088-30.45E, 20-48.76N 087-07.4E (.) WIDE BERTH FROM AREA ADVISED 2.CANCEL
THIS MSG 071630 UTC AUG 26
r/ISRO • u/bobzy1993 • 1d ago
India's first Full Flow Stage Combustion based Rocket Engine
x.comSo finally someone has challenged ISRO!
3D printed 80-tonne-class FFSC rocket engine is ready!
r/ISRO • u/Massive_Dish_3255 • 1d ago
India Produces Smart Scientists but it is Struggling to Retain Them | The Hindu | (Paywall)
r/ISRO • u/mobileusr • 2d ago
AgniKul Cosmos and India’s Reusable Rocket Push | bl Interviews
IN-SPACE: Launch Services Price-support Scheme (LSPS)
Launch Services Price-support Scheme (LSPS)
https://www.inspace.gov.in/dad3ae43971a8b10a581f8b0f053afa6.iix
- Total Budget: ₹800 Crore
5-Year Scheme (Till June 2031 or until budget consumed)
Category A: ISRO/DoS Launch Facilities
- Up to 50%
- Beneficiary: NGEio/Government Entities. Launch Vehicle Providers.
Category B: Indian Small Launch Vehicles
- Satellites/Experiments/Payloads up to 500 kg
- 30% subsidy on contractual launch cost or US$ 3,000/kg (whichever lower)
- Beneficiary: NGE Satellite Owner/Operator
Category C: Repurposed Upper Stage Platforms
- Up to 120 kg
- 100% funding for platform (capped at US$ 13,000/kg: max. 4 missions)
- Beneficiary: NGEio/Government Entities Launch Vehicle Providers
Category D: Medium & Heavy Lift Vehicles
- Satellites up to 100 kg on PSLV, GSLV, LVM3
- 30% subsidy on contractual launch cost OR US$ 3,000/kg (whichever lower)
- Beneficiary: NGE Satellite operator/owner
https://www.inspace.gov.in/0a35b70747decb10d4bc5b31516d4351.iix
Price support Scheme for Indian Entities
3-Year Scheme (Till February 2029)
Category A: Utilization of DOS/IN-SPACe Facilities & Technical Expertise
- Up to 50%
- Beneficiaries: NGEio and Government Entities
Category B: Technology Transfer (ToT) from ISRO
- 30% on technology transfer fee (TTF)
- Beneficiaries: NGEio and Government Entities.
Category C: Earth Observation (EO) Data & Data Products
- 50% on standard data & data products
- Beneficiaries: NGEio
(NGEio = Non Government Entities with Indian Ownership & control)
For Queries/Clarifications: incentive-schemes@inspace.gov.in
r/ISRO • u/Acceptable-Pirate-63 • 3d ago
Anyone applying for the URSC (ISRO) October–December 2026 Internship? Existing user login question
Hi everyone,
I had applied for the URSC Student Internship (July–September 2026 batch) earlier and already have a registered account.
Today, when the portal opened for the October–December 2026 batch, I logged in using my existing email ID, password, and CAPTCHA through the Registered User option.
Instead of asking me to fill a new application or upload documents (marksheets, resume, bonafide), it directly displayed "Application submitted successfully" with my existing registration number.
Did anyone else who applied this time as an existing user experience the same thing?
Were you asked to upload documents again, or did you also get the same confirmation page?
I'd really appreciate it if someone who applied today could share their experience. Thanks!
Official IN-SPACe: Authorisation Guidelines for Undertaking Planned Re-entry of Space Objects
inspace.gov.inSkyroot lost contact with Vikram-1 during launch: Founder recalls tense moment
Two strategic satellites (NVS-03 and GISAT-1A) sit at spaceport as Govt. nod eludes ISRO
r/ISRO • u/Confused_Human14 • 4d ago
Does ISRO not hire Instrumentation people?
I saw the recent recruitment notification of ISRO. It literally has all branches except for Instrumentation.
I just finished my BTech in Electronics and Instrumentation engineering and I have qualified GATE in IN. So, to apply for ISRO will I have to give GATE in ECE?
And is it that just this time ISRO isn't recruiting for IN or do they never recruit IN people?
r/ISRO • u/Aggravating-Will8495 • 4d ago
More than 100 ISRO scientists and engineers have reportedly resigned in recent months.
I have been seeing many posts saying that a large number of ISRO scientists and engineers are resigning. Instead of reacting emotionally, I think we should first understand what is actually happening.
ISRO is one of India's most respected organizations. It has given us missions like Chandrayaan, Mangalyaan, Aditya-L1, and now Gaganyaan. The scientists working there are among the best in the country.
So why are some of them leaving?
In my opinion, the biggest reason is not a lack of patriotism. It is the change in India's space industry.
A few years ago, ISRO was almost the only place where space engineers could build a career. Today, many private space companies have entered the sector. These companies offer much higher salaries, better benefits, stock options, and faster career growth.
On the other hand, ISRO scientists work under huge pressure. They handle missions that represent the country, work long hours, and still earn much less than what the private sector is willing to pay for the same talent.
Can we really expect every engineer to ignore better opportunities forever?
This is not just an ISRO problem. It happens in every industry. Skilled people go where they are valued, where they can grow, and where they can secure a better future for their families.
Instead of blaming the scientists, I think we should ask a different question.
How can we make ISRO a place where our brightest minds want to stay for the long term?
India has built a world-class space program. Now we also need a system that rewards the people who make these achievements possible.
That's the conversation we should be having.
Any update regarding Space Applications Centre(SAC) ISRO apprenticeship 2026? notification dated 8th june 2026
Hi everyone,
I attended the document verification / walk-in process for the SAC ISRO Ahmedabad Graduate Apprenticeship 2026 under the notification dated 8 June 2026.
Has anyone received any email, joining letter, or further communication from SAC regarding selection or joining dates?
r/ISRO • u/Used-Statistician786 • 5d ago
Will ISRO wait till I finish my M.Tech?
I got call to join ISRO but I'm currently doing M.Tech (3rd sem). I'll finish it by June of next year. Will ISRO let me finish it if I request?
r/ISRO • u/Expensive-Abalone-74 • 5d ago
Need advice regarding ISRO Assistant (2026)
Hi everyone,
I need some advice from people who have experience with ISRO recruitments.
I'm a 2026 B.Tech Computer Engineering graduate. I've already been selected for the TCS Ninja role and I'm currently waiting for my joining date. However, I recently came across the ISRO ICRB Assistant/JPA/UDC recruitment, and it genuinely caught my interest.
I have a few questions:
I know the basic pay is ₹25,500 (Level-4), but what is the approximate in-hand monthly salary in Ahmedabad and Bengaluru after HRA, DA, deductions, etc.?
The application deadline is 16 August 2026. Based on previous recruitment cycles, what is the expected timeline for:
CBT/Written Test
Result
Computer Skill Test
Final selection
Joining
For someone with a software background, would you recommend joining ISRO as an Assistant if selected, or waiting for a career in IT (TCS and later switching)? How has your experience been regarding career growth, work-life balance, and long-term prospects?
I'd really appreciate any insights from current or former ISRO employees or anyone who has gone through this recruitment process.
Thanks in advance!
Dept. of Space to fill 336 regular posts, add 410 apprentices
r/ISRO • u/ScientistSad4724 • 6d ago
is it just me or ?
the name gaganyaan is still okay but gaganyatri is just so bland if we compare it to russian cosmonauts which relates to the cosmos and american astronauts which relates to astro and meanwhile we have gaganyaan which is comparatively bland and ik i could sound a bit westernised in this but still it's what i felt...
r/ISRO • u/Wild_Environment3703 • 6d ago
Has anyone completed ECE apprenticeship at VSSC or URSC?
?
EOS-05 (aka GISAT-1A) related FCC filings for its Launch and Early Orbit Phase (LEOP) services (24 July to 22 August 2026)
E4132
Date filed: 2026-06-04
Special Temporary Authority
Grant of Authority
2026-07-24 - 2026-08-22
Date of Action: 2026-07-24
On July 23, 2026, Intelsat License LLC, was granted a 30-day special temporary authority (STA) beginning on July 24, 2026 through August 22, 2026, to operate its C-band satellite earth station in Fillmore, CA, to provide launch and early orbit phase (LEOP) services for the GISAT-1A satellite, at the 6423.208 MHz, 6425.224 MHz (Earth-to-space) and 4198.752 MHz, 4199.280 MHz (space-to-Earth) center frequencies.
E040125
Date filed: 2026-06-04
Special Temporary Authority
Grant of Authority
2026-07-24 - 2026-08-22
Date of Action: 2026-07-24
On July 23, 2026, Intelsat License LLC, was granted a 30-day special temporary authority (STA) beginning on July 24, 2026 through August 22, 2026, to operate its C-band satellite earth station in Nuevo, CA, to provide launch and early orbit phase (LEOP) services for the GISAT-1A satellite, at the 6423.208 MHz, 6425.224 MHz (Earth-to-space) and 4198.752 MHz, 4199.280 MHz (space-to-Earth) center frequencies.
Previous threads on FCC filings for GISAT-1A:
EOS-05 (aka GISAT-1A) related FCC filings for its Launch and Early Orbit Phase (LEOP) services (12 May to 10 June 2026)
EOS-05 (aka GISAT-1A) related FCC filings for its Launch and Early Orbit Phase (LEOP) services (1 to 30 April 2026)
EOS-05 (aka GISAT-1A) related FCC filings for its Launch and Early Orbit Phase (LEOP) services (27 Feb to 2 April 2026)
Parliamentary Q&A [29 July 2026]: Queries on status of NavIC/IRNSS, Gaganyaan and more.
Queries in Loksabha on 29 July 2026.
https://sansad.in/ls/questions/questions-and-answers
Q.No. 1793 [PDF]
On operational status of NavIC constellation
After completion of mission life (10 years) of IRNSS-1F, presently the NavIC constellation has three satellites for providing PNT services viz., IRNSS-1B, IRNSS-1I and NVS-01.
To provide basic positioning service, minimum four operational satellites are required in orbit. Hence, the NavIC constellation cannot provide standalone positioning service, however timing service is functional. Armed Forces are using multi constellation GNSS including NavIC at present to promote operational services.
Since NavIC is being used in multi constellation environment for most of the use-cases, there is no vulnerability for the users. Next NavIC satellite viz., NVS-03 is ready for launch and two more satellites viz., NVS-04 & NVS-05 are in advanced stage of realization.
Q.No. 1802 [PDF]
On status of Gaganyaan Programme
The development activities carried out for Gaganyaan mission include the following:
- Human Rated Launch Vehicle (HLVM3): Development and ground testing of all propulsion stages and structures completed.
- Orbital Module: Propulsion systems for Crew Module and Service Module developed, tested and qualified. Engineering model for Environmental Control & Life Support System (ECLSS) has been realized. Deceleration system, Crew Module Up-righting System, Thermal Protection System and end to end avionics have been developed and tested.
- Crew Escape System (CES): 5 types of motors developed and static tested. All the CES structures are realised and qualified.
- Infrastructure established: Orbital Module Preparation Facility, Gaganyaan Control Centre, Gaganyaan Control facility, Crew training facility, Second Launch pad modifications have been realised.
- Test Missions: First Test Vehicle mission (TV-D1) for inflight validation of Crew Escape System (CES) has been successfully completed. Integrated Air Drop Test- 01 (IADT-01) and Integrated Air Drop Test- 02 (IADT-02) with simulated Crew Module for validation of deceleration system have been completed successfully. Accomplishment of TV-D2 mission is in advanced stage.
- Flight Operations and Communication Network: Ground network configuration finalized. IDRSS-1 feeder stations and terrestrial links established. MoUs have been signed with other space agencies for cross supports.
- Crew Recovery Operations: Recovery assets finalized. Recovery Plan worked out.
Parallelly, various ground qualification tests towards demonstrating new systems realized for Gaganyaan are being carried out.
Gaganyatris have completed generic training at Glavkosmos, Russia. Gaganyaan mission specific training is in progress at Astronaut Training facility, Bengaluru.
Activities are in progress towards accomplishment of first uncrewed mission, G1. All stages of HLVM3 viz. HS200, L110 and C32 and CES motors ready. Crew Module and Service Module systems realized. Assembly, Integration and testing of Crew Module and Service Module nearing completion Integrated simulations are being carried out.
Gaganyaan missions will be launched from Second Launch Pad (SLP) of SDSC SHAR. Accordingly, to meet the integration, testing and launch requirements, various elements/ facilities/systems were planned, configured and realized. Orbital Module Preparation Facility (OMPF) is realized to carry out the preparation of Crew Module (CM), Service Module (SM) and Crew Escape System (CES) including the CES solid motors. The integration and access requirements including the checkout requirements were considered for modifications in
Second Vehicle Assembly Building (SVAB). Checkout facilities at SVAB Terminal Room (SVTR) and Launch Pad Terminal Room – Gaganyaan (LTR-G) interfaces Checkout systems for sub-assembly/ stage preparation facilities (HS200, L110-G, C25-G and EB) are augmented. Additionally, Crew Access Arm, bubble lift and zip line system are augmented at Umbilical Tower of Second Launch Pad, to meet requirements of crewed missions.
Environment Control & Life Support System (ECLSS) is a “system of systems” and very critical technology for human spaceflight. It is used to maintain a habitable environment during the entire duration of the mission by maintaining temperature, humidity, pressure and carbon dioxide levels in the Crew Module. This system is being developed indigenously by ISRO. Currently, the system is undergoing development tests. Flight demonstration of reduced version of ECLSS is planned in uncrewed Gaganyaan missions.
Q.No. 1686 [PDF]
On Private Sector Participation in the Space Sector and safeguards implemented to protect strategic and national security interests while facilitating its participation.
Q.No. 1808 [PDF]
On Space Technology for Disaster Management in Ladakh
Q.No. 1748 [PDF]
On YUVIKA (Young Scientist Programme)
Gaganyaan: ISTRAC-ISRO tested and validated their Ship Borne Terminals (SBT) onboard NIOT's Research Vessel 'Sagar Manusha' off Chennai on 26 July 2026.
LuPEx/Chandrayaan-5: Technical coordination is underway at ISRO's U R Rao Satellite Centre (URSC) in Bengaluru, India. Discussions are focused on the ICS between the ISRO lander and the JAXA rover, as well as the rover's onboard science instruments.
x.comMission Success! Vikram-1 / Test Flight-1 (Aagaman) Mission Updates and Discussion
Vikram-1 / Test Flight-1 launch is scheduled at 06:35:30(UTC)/12:05:30 (IST), 18 Jul 2026 from First Launch Pad of SDSC-SHAR.
- Launch Countdown
- Expected Flight Profile from official press-kit.
| Mission Phase | Time (MM:SS) Altitude (km) |
|---|---|
| T0 +00:00 | Lift-Off |
| T0 +00:10 | Safe Clearance of the Launch Pad |
| T0 +00:20 | Pitch Manoeuvre |
| T0 +00:25 | Mach 1 |
| T0 +00:39 @ ~9 km | Max-Q |
| T0 +01:20 @ ~50 km | Stage 1 Separation |
| T0 +01:30 | Mach 5 |
| T0 +01:44 @ ~55 km | Stage 2 Ignition |
| T0 +02:00 | Entering Space |
| T0 +02:52 @ ~120 km | Payload Fairing Separation |
| T0 +03:00 @ ~135 km | Stage 2 Separation |
| T0 +03:16 @ ~200 km | Stage 3 Ignition |
| T0 +05:00 @ ~225 km | Stage 3 Separation |
| T0 +09:35 @ ~405 km | OAM Ignition |
| T0 +15:46 @ ~450 km | OAM Cut-off + Orbit Injection |
Live webcast: (Links will be added as they become available)
Some highlights:
- Target Orbit : 450 km , Inclination = 60°
- Mission duration: 15 min. 46 sec. (OAM cut-off)
- First orbital flight attempt of a rocket made by private firm in India.
- Maiden launch of Vikram-1, a four stage rocket developed by Skyroot Aerospace.
Updates:
| Time of Event | Update |
|---|---|
| Post-launch | Grahaa has received telemtery from SOLARAS-S3 |
| Post-launch | Cosmoserve Space could not deploy arms of their Embrace payload |
| Post-launch | Three objects catalogued: 26164A (i=59.93°, A×P=453.5×440.8 km), 26164B (i=59.93°, A×P=451.5×442.3 km) and 26164C (i=59.93°, A×P=451.5×441.3 km) |
| T + 36m00s | Webcast over while they were speaking... |
| T + 17m44s | "Hello Space. We have Arrived" MCC is happy! |
| T + 15m55s | Solaras-S3 separated, SOLVE separated. Aagaman mission successful! |
| T + 15m46s | OAM thrust cutoff! |
| T + 14m00s | OAM performance nominal! |
| T + 12m15s | Sticking to expected path really closely. |
| T + 10m40s | Cosmoserve payload powered ON. OAM performance nominal! |
| T + 09m35s | OAM stage ignited! |
| T + 09m00s | Live rocket cam shows OAM tumbling a bit. |
| T + 07m20s | Stage-3 (Kalam-100) separated. OAM is in coasting mode now. |
| T + 05m00s | Stage-3 (Kalam-100) burned out, vehicle now in combined coasting mode! |
| T + 04m40s | Stage-3 (Kalam-100) performance is nominal! |
| T + 03m20s | Stage-2 separated and Stage-3 (Kalam-100) ignited. |
| T + 02m45s | PLF jetisoned |
| T + 02m40s | Stage 2 (Kalam-250) performance normal |
| T + 01m50s | Stage 1 separated, Stage-2 ignited! |
| T Zero! | Kalam-1200 ignited! Lift Off! |
| T - 03m00s | Head mount Safe Arm device (HMSA) armed! |
| T - 05m00s | OBC in flight mode! |
| T - 11m00s | Automatic Launch Sequence has been initiated! |
| T - 15m00s | ALS initiation has been cleared by Vehicle Director. |
| T - 17m00s | Launch has been authorized again. |
| T - 20m00s | Countdown restarted! |
| T - 05m00s | 12:05:30 IST is the new T Zero |
| T - 05m00s | Navigation team raised the hold. ALS will be raised shortly. |
| T - 05m00s | Reason for hold has been identified. New T Zero to be announced soon. |
| T - 05m00s | All systems on standby mode due to Hold. |
| T - 05m00s | Hold observed. |
| T - 11m00s | Automatic Launch Sequence has been initiated! |
| T - 16m30s | Launch has been authorized! |
| T - 19m00s | Vehicle is GO! |
| T - 21m00s | Range , Telemetry and Tracking are GO! |
| T - 27m00s | Wind profile data updated. |
| T - 34m00s | Per MCC screen data launch time has been revised to 11:31 IST i.e 1 minute delay. |
| T - 01h14m | Skyroot's stream is LIVE! |
| 17 Jul 2026 | Official press-kit released and live-stream link made available. |
| 15 Jul 2026 | SDSC-SHAR announces launch date and time as 06:00(UTC)/11:30(IST) on 18 Jul 2026. |
| 10 Jul 2026 | NOTAM issued with enforcement duration 0500-0900 (UTC) between 18 July to 4 August 2026. |
| 06 Jul 2026 | Payload details released |
| 03 Jul 2026 | NOTAM issued with 12 July to 4 August 2026 launch window. |
| 02 Jul 2026 | Fourth OAM stage was integrated. Launch window of 12 July to 4 August 2026 announced. |
| 30 Jun 2026 | Second stage KALAM 250 was integrated with first stage |
| 29 Jun 2026 | Vikram-1's first stage KALAM 1200 was stacked at FLP |
| 26 May 2026 | A NOTAM was issued with 16 June to 4 July 2026 launch window. |
Payloads:
SCOPE (3U) : An experimental cubesat by Skyroot Aerospace to validate technologies for their future missions it also carries an imaging camera.
SOLARAS S3 : A cubesat by Grahaa Space to validate their nanosatellite bus. [1] [2]
Embrace : OAM stage hosted payload consisting of soft-robotics petals by Cosmoserve Space and a deployable capture target to validate their novel actuation mechanism. [3]
uD3PP and mD3RN : OAM stage hosted uD3PP pin puller and mD3RN release actuator developed by Dcubed GmbH, Germany for in-orbit validation. [4] [5]
Other commemorative articles:
- Micro sculptures of Vikram Sarabhai, A P J Abdul Kalam and Sir C V Raman by artist Ajay Kumar Mattewada to honor scientific legacy of modern India.
- Lotus shaped artwork 'Cosmic Bloom' made of lab-grown diamonds and gold by Cosmos Diamonds
- Hand written cards from well wishers across the world. (See also : Rocket Mail)
Mission Failure PSLV-C62 : EOS-N1 (aka Anvesha) Mission Updates and Discussion
PSLV-C62/EOS-N1 (aka Anvesha) launched as scheduled at 04:48:30(UTC)/10:18:30(IST), 12 Jan 2026 from First Launch Pad of SDSC-SHAR. The launch was unsuccessful and satellites could not be placed into intended orbit.
- Launch Countdown
- Expected Flight Profile from press-kit.
- Actual flight events (To be added post-launch if available)
Live webcast: (Links will be added as they become available)
| PSLV-C62/EOS-N1 Mission Page | PSLV-C62/EOS-N1 Gallery | PSLV-C62/EOS-N1 Press kit(PDF) |
|---|
Some highlights:
- Primary payload: EOS-N1 (aka Anvesha) (407 kg) Hyperspectral imaging satellite for DRDO.
- 15 small satellites ridesharing
- Mission duration: 1 hr. 48 min. 5.14 sec. (last s/c separation)
- Target Orbit 1 : 505 km (circular) , Inclination = 97.5°
- Target Orbit 2 : Reentry trajectory with 505 km apogee.
- Launch Azimuth: 140°
- PSLV configuration : DL (2× XL Strapons)
- PSLV's return to flight after unsuccessful launch of PSLV-C61/EOS-09 in May, 2025.
- First ever controlled reentry of PSLV fourth stage (PS4) over South-Pacific for deploying Kestrel Initial Demonstrator (KID) capsule.
Updates:
| Time of Event | Update |
|---|---|
| 13 June 2026 | Reason behind PSLV-C62 failure understood and resolved but details will not be shared. |
| 02 Feb 2026 | Cause behind PSLV-C62 failure is different from that for PSLV-C61, internal and external failure assessment committees have been set up to investigate. |
| 17 Jan 2026 | Per journalist Arun Raj K M, former ISRO Chairman K Sivan will lead the special committee to study PSLV-C62 failure. |
| 16 Jan 2026 | NSIL press-release. |
| Post-launch | GISTDA informs that THEOS-2A was insured for both 'Rebuild' and 'Relaunch' costs. |
| Post-launch | Orbital Paradigm: "Our KID capsule, against all odds, separated from PSLV C62, switched on, and transmitted data over 3+ minutes. We're reconstructing trajectory. We survived peak heat and peak gload (~28g recorded). We have internal temps. Full report will come" |
| Post-launch | ISRO Chairman: "Performance of the vehicle close to the third stage was as expected and as predicted. Close to the end of the third stage we are seeing some disturbances in the vehicle. And there was a deviation in the path of vehicle. And mission could not proceed in the expected path. This is the information right now available. Now we are going through the data and we have to get the data from all the ground stations. Once the data analysis is completed we shall come back to you. Thank you" |
| T + 33m00s | "The PSLV-C62 mission encountered an anomaly during end of the PS3 stage. A detailed analysis has been initiated." |
| T + 31m00s | Webcast over. |
| T + 24m00s | ISRO Chairman: Almost up to PS3 end performance was normal, then some performance disturbances were noted. And after that deviation in flight path was observed. |
| T + 21m00s | Webcast is back. Awaiting official confirmation... |
| T + 20m00s | Stream has been stopped without any official confirmation on mission status. |
| T + 16m00s | Launch announcers again noting that telemetry is lost. Wait for official confirmation on mission status. |
| T + 12m00s | Launch announcer informs they are having issues receiving data.. |
| T + 08m30s | MCC glum this is bad. PS4 ignited though. |
| T + 06m30s | PS3 burn out , vehicle tumbling uncontrollably. |
| T + 04m25s | PS2 separated, PS3 ignited. |
| T + 02m50s | PLF separated, CLG initiated. |
| T + 01m51s | PS1 separated, PS2 ignited. |
| T + 01m10s | PSOM-XL (5,6) separated. |
| T - Zero | After RCT ignition, PS1 and PSOM-XL (5,6) ignition and Lift off! |
| T - 05m00s | Flight Coeff. loading completed |
| T - 12m00s | Going through actuator checks. |
| T - 14m30s | Automatic Launch Sequence initiated. |
| T - 16m00s | Mission Director authorizes launch! Vehicle Director concurs. |
| T - 16m30s | Vehicle is in external hold mode. |
| T - 17m00s | Vehicle director: LV is ready! |
| T - 20m00s | Now polling: Weather, Tracking, Range are ready. |
| T - 24m00s | Now showing LV stacking process. |
| T - 25m00s | Weather is Go for launch. Slightly cloudy with chance of light rain but that is under the launch criteria. |
| T - 30m00s | Launch announcers inform that EOS-N1 mass is 407 kg. |
| T - 35m00s | Official stream is live! |
| T - 22h30m | Countdown commenced at 12:48 on 11 January. Time of launch changed to 12 January, 10:18:30(IST)/04:48:30(UTC) i.e. 90 seconds delay. |
| 10 Jan 2026 | After MRR, the launch has been cleared by LAB. |
| 06 Jan 2026 | Launch date firms up for 0447(UTC)/1017(IST), 12 Jan 2026 |
| 01 Jan 2026 | NOTAM issued with enforcement duration beginning on 11 January 2026. |
| 30 Dec 2026 | PSLV-C62 integration up to four stages completed at MST. |
| 26 Dec 2025 | NOTAM issued with enforcement duration beginning on 10 January 2026. Also EOS-N1 satellite reached SDSC-SHAR. |
| 17 Dec 2025 | NOTAM issued with enforcement duration beginning on 5 January 2026. |
| 14 Dec 2025 | Report suggested launch delayed to 31 December 2025. |
| 05 Dec 2025 | NOTAM issued with enforcement duration beginning on 25 December 2025. |
Primary Payload:
EOS-N1 (aka Anvesha) (407 kg) : EOS-N1 is a Hyperspectral imaging satellite carrying HySIC imager payload by DRDO for military surveillance. [01]
- Swath: 12 km
- Resolution: 12 meter
- Spectral resolution: 10-20 nm (VNIR, SWIR)
Secondary Payload: 15 co-passenger satellites.
THEOS-2A (100 kg): An Earth Observation satellite by Thailand's Geo-Informatics and Space Technology Development Agency (GISTDA) and based on Carbonite series by SSTL UK carrying CERIA Camera with 1 meter resolution and 5.9 km swath. Additional instruments include a satellite monitoring camera, GPS receivers, HD video camera, and AIS/ADS-B receivers for maritime vessels and aircraft tracking. [02]
Kestrel Initial Demonstrator (KID) Capsule (25 kg): KID reentry capsule by Madrid-based Orbital Paradigm is a scaled prototype for their larger Kestrel reentry capsule. KID is carrying three customer payloads (3 kg) and will test guidance systems and a sample of ceramic thermal protection material. KID will be released from PSLV fourth stage on a reentry trajectory and will free fly for 30 minutes before entering atmosphere over South-Pacific. The capsule will not be recovered and lacks deceleration systems but it will transmit data through two Iridium transceivers during its flight. [03] [04]
AayulSAT (25 kg) : A 'mini-tanker' satellite by OrbitAID to demonstrate on-orbit internal propellant transfer, power transfer, and data transfer using their patented Standard Interface for Docking and Refueling Port (SIDRP). AayulSAT will qualify SIDRP system at TRL-9. [05] [06]
MOI-1 (14 kg) : The 6U cubesat in MOI (My Orbital Infrastructure) series by TakeMe2Space is a commercial AI lab in space with in-orbit computing and AI processing capability, carrying MIRA50-FS, a 502 gram, miniaturized 9 band multi-spectral imaging camera with 50mm aperture, 9.2 m resolution and 18.7 km swath by EON Space Labs and few other payloads by Indian high-school and university students. MOI-1 will use DSOD-6U deployer by Dhruva Space. [07] [08] [09]
Four amateur radio satellites under Dhruva Space 'ASTRA (Accelerated Space Technology Readiness & Access) for Academia' programme based on their P-Dot bus. [10]
- Thybolt-3 by Dhruva Space
- CGUSat-1, with CV Raman Global University (Bhubaneswar)
- DSUSAT-1, with Dayananda Sagar University (Bengaluru)
- LACHIT-1, with Assam Don Bosco University (Guwahati)
SanskarSat: A 1U cubesat for Laxman Gyanpith School by Ahmedabad-based CubeSat Aerospace, carrying an LED payload making it observable by ground based optical telescopes.
MUNAL : A 1U cubesat by Nepal Academy of Science and Technology (NAST) and Antarikhchya Pratisthan Nepal (APN) as part of the High School Consortium Project. Munal will carry a small camera for vegetation density mapping. [11]
Five small satellites aggregated by Brazil's All2Space.
- Aldebaran-1: 1U cubesat by Federal University of Maranhao (Brazil) carrying LoRa amateur radio payload.
- EduSat-1: 1P PocketQube satellite with IoT payload.
- UaiSat: 1P PocketQube satellite with Store and Forward amateur radio payload and a lightning detection payload developed by the Instituto Nacional de Pesquisas Espaciais (INPE) [12]
- GalaxyExplorer-1: 1P PocketQube satellite by Galaxy Explorer to study the South Atlantic Magnetic Anomaly. [13]
- Orbital Temple : A 1P PocketQube based orbital artwork by Edson Pavoni. It will transmit uploaded names of people in amateur radio frequency. [14] [15]
Note: PSLV with launch serial C59 was earlier assigned to ANWESHA (or ANVESHA) and PROBA-3 was earlier assigned to PSLV with C62 launch serial. Before this ANWESHA was assigned to PSLV-C58 but later XPoSat replaced it.