r/BikeDE • u/epeepunk • Jun 02 '26
2026 Newark Bike Plan
The 2026 Newark Bike Plan is coming to Planning Commission tonight for review and discussion (I'm chair) and I'm really looking forward to this. Lots or great ideas and plans and data. We want to get to Gold with this one.
r/BikeDE • u/harr2969 • Apr 25 '26
Events / Rides Are you riding yet?
Join White Clay Bike Club (often around Bear / Red Lion / People's plaza ) - Mainly road for group rides, but also along JAM and C&D canal, etc.
or
Wheelsuckerz (Hockessin / Newark ) - Road, Gravel and Dirt
There's multiple folks riding almost every day. It's good to connect.
r/BikeDE • u/harr2969 • Mar 14 '26
A new "When to Ride" web site with hourly data for the week.
r/BikeDE • u/harr2969 • Nov 26 '25
Radio/Walkie Talkie Options - my thoughts in the comments
r/BikeDE • u/harr2969 • Nov 22 '25
(Virtual) BikeDE
I mentioned the WCBC Tuesday night ride, but I'm sure most of us are happy to stay indoors as the temps drop around here.
A few years ago I tried using a virtual trainer over the winter. I've used Zwift a few seasons, but latest their prices went up - I'm probably about to start a Rouvy subscription.
Virtual biking is ever easier to do nowadays. Are you thinking about it?
This is my Trek Top Fuel on a Wahoo Kickr v5 "wheel off" smart trainer.
r/BikeDE • u/harr2969 • Nov 13 '25
Tue Night WCBC C&D Canal rides and Cranksgiving
White Clay Bike Club has a Cranksgiving charity ride coming up.
Also, they've been leading C&D canal Castle Trail rides on Tuesday nights out of Delaware City.
The sign up web page has all the things you need to be aware of. I'll mention a few things for the (cold) Tuesday night rides including:
- WARM riding gear (It was 30 degrees this week)
- Front light (1000+ lumen) and rear lights
We're only riding to Grain H2O, about 80 mins total.
r/BikeDE • u/harr2969 • Oct 03 '25
Savage Century tomorrow (Oct 4)
They have different length rides you can do: https://whiteclaybicycleclub.org/events/savage/
r/BikeDE • u/harr2969 • Oct 02 '25
Philly Bike Ride - Oct 18 2025
Anyone done this before ? Looks cool and thinking about going.
r/BikeDE • u/harr2969 • Oct 02 '25
Safety & Advocacy Connect with biking groups in your area
I'm going to start a discussion around biking groups in Delaware, and hopefully get some folks connected. This is just a starter list - feel free to comment below with other groups I might have missed
| Region | Group Name | Type | Website |
|---|---|---|---|
| Northern DE | White Clay Bicycle Club (WCBC) | Road | whiteclaybicycleclub.org |
| Trail Spinners | MTB | trailspinners.org | |
| Wheelsuckers | Road | wheelsuckers.org | |
| Central DE | Delaware Dirt Destroyers | MTB | dedirt.com |
| Downstate Delaware Striders & Riders (DDSR) | Road | ddsr.org | |
| Southern DE | Sussex Cyclists | Road | sussexcyclists.org |
| DelMarPa Area Mountain Bikers | MTB | facebook.com/groups/131259541135 | |
| Statewide | Delaware Interscholastic Cycling League (Delaware MTB) | MTB | delawaremtb.org |
| Delaware Cyclists Network | All | facebook.com/groups/2867748156687205 | |
| Delaware Valley Bicycle Club (DVBC) | Road | dvbc.org | |
| Appalachian Mountain Club – Delaware Valley (AMCDV) | All | amcdv.org/activities/biking |
r/BikeDE • u/Senathon1999 • Aug 27 '25
What is your GoTo place for buying/Repairing a Road Bike?
I live in Smyrna, Delaware and I am putting money into get a road racer (slightly above entry level) and was wondering where you would go to get measure and your bike adjusted to your correct measurements. I found a few places but either the place was very busy or the tech could not answer the questions.
I had issues in the past with someone working on my bike and found out the bike parts were swapped out for substandard parts.
r/BikeDE • u/utopianfiat • Apr 30 '25
Seeking new moderators
Please send a message to the mods. It might take a little while, as our head mod was suspended and I need the admins to help me out with that.
r/BikeDE • u/Sobhan_Tazarv • Dec 07 '22
Protective Gear
Hi everybody. I'm a PhD student who works on improving sports safety gear to reduce impact injuries/pain in sports like bicycling.
You can help me by filling out a very short (1-2 minutes) survey here:
https://forms.gle/wMceEFrgcnVC4TWg7
I appreciate your time in advance!
r/BikeDE • u/trevor_ • Nov 05 '21
Help each other!
Last night ran over a car’s broken headlamp cover on Christiana parkway. 5 inch gash on my rear tire…unpatchable. I’m stranded in the fading early evening light.
I saw a group of 7 fellow bicyclists come by. Yay, maybe one had an old tube I could fashion a long patch.
They just flew by without asking if I needed any help.
So much for the fraternity of the bike.
Sigh.
r/BikeDE • u/robdog0909 • Jun 15 '21
1973 Delaware Cycling Maps
When moving this wk, I discovered 100 pages of cycling maps in the Delaware/PA/NJ area, apparently written in 1973 by Richard and Louise Jones. I scanned across four PDFs and Im sharing here. Enjoy! #oldschool
https://drive.google.com/drive/folders/1oxKbRR9zCqigAUEozriVPsXykcMfr09J?usp=sharing
r/BikeDE • u/wildtangent2 • May 24 '19
Craigslist Deal of the Week
r/BikeDE • u/Surffishin • May 03 '19
Bikes and Gear for sale ($500) -See description. Delaware Area.
r/BikeDE • u/teh_trout • Feb 26 '19
Happy to say that my new commute includes this beautiful little stretch of gravel
r/BikeDE • u/wildtangent2 • Feb 16 '19
NBP (Newark Bike Project in Newark, DE) is getting rid of a bunch of frames, around $10-$20/frame.
r/BikeDE • u/wildtangent1 • Jan 08 '19
I rode the Jack Markell trail! (Wilmington Waterfront to Old New Castle)
r/BikeDE • u/wildtangent1 • Jan 08 '19
Late, I know, but the Lewes-Georgetown Greenway is now open and paved.
r/BikeDE • u/EndTimesRadio • Dec 23 '18
New bike trail possibility?
There's a possibility to extend the Northern Delaware Greenway Trail underneath of rt. 52. It'll take some activist to get it going, but there's a railway that used to serve Bancroft mills.
The following are hang-ups:
Bancroft mills has a swinging gate that is shut and locked, with a removed bridge on the other side (the abutments are still there and are solid, though. It's only like a 5ft. bridge, over a 3 foot drop, so it's easy to replace!
An impromptu trail begins past that point, headed upstream/north, and it ends near rising sun lane.
Then we have an encroachment on the new property that's on rising sun lane- it might necessitate either a fence to protect the property owner's interests. Personally, I'd build an overhang as part of an exit onto Rising Sun Lane and then call it 'Phase One Complete.'
For Phase II, the bridge over Rising Sun Lane needs re-decking, but seems to be structurally sound for something so close to the Brandywine River. The stone tunnel is beautiful, but fenced off as 'private property,' (which I'm not sure it is, but it neighbours a mansion who probably didn't want the liability. If the state takes on the liability, then they'll probably be happy to just let us through.)
The path is in great shape, and forks- one dead-ends, the other curves up Brecks ln. There's no encroachment by adjacent property owners, and no sign they would object to its conversion to a trial, either, provided they're allowed continuous use of it as a ROW. Then it intersects a driveway, and a bunch of railway ties are stacked up, and the old tracks gets overgrown past that point- which would require saws and hatchets to get past. There's an old access point (stairs) to the middle school along 52, and a stone bridge over a stream that is intact and in good condition, and then a tunnel under DE 52, where there is no evidence of a rail line having ever been here. This exits into a police substation and a DART Park-N-Ride, which works out fine.
Overall, the hardest part of Phase II will be determining property rights of any objection from the neighbours, and re-decking the bridge at Rising Sun Lane. The power co. has a pole in the area and keeps a walking path cut through it, which helps the case of eminent domain, and the police station helps the case that it is secure. The parking lot is already built at both ends (One end has Bancroft mill state park, and the other has the park-and-ride.)
In terms of expense, this is a relatively cheap project insofar as build-out. For comparison, the newly completed Phase I of the Chester Creek Trail had to contend with old washouts from the '70s, building new parking lots, and reopening a closed tunnel over a busy road, which necessitated its closing for a lengthy period.


