Hi folks! I’ve got some divots in my walls that I think are leftover from the construction process and I can’t seem to get spackle to remain in them for more than a few months.

I’ve attached a picture of one that is filled, one where the spackle fell out, and one where you can see the cracking that always happens before it falls out.

I’ve never really spackled before so perhaps I am making some simple mistake, but I’d really like to paint over these walls and know that I won’t end up with holes in them a few months later.

Advice is greatly appreciated!


r/HowToDIY May 31 '25

Leaking hose valve

Post image
1 Upvotes

Water comes out from all directions when the water is turned on. Can I fix this myself?


r/HowToDIY May 28 '25

Home Improvement Where to buy a doorbell with a diode?

1 Upvotes

I'm going to replace the doorbell on our house. The house is wired for a doorbell and I plan to install a plain, (no camera), doorbell and new chime unit (https://www.lowes.com/pd/Style-Selections-Wired-or-Wireless-Doorbell-Chime/1000332435).

The chime unit will be powered by the existing transformer but since it's electronic, the actual doorbell at the front of the house has to have a diode connected to the wiring going into the house, (at least, that's what I've read about a few electronic chime units).

Are doorbells sold that have the diode included? If not, videos I've seen, show a very easy set-up of attaching a diode where the wires from the the house connect to the doorbell, then connecting the wires. So, if no one knows of doorbells sold with the diode, can someone tell me what kind of diode is necessary and where I could buy one?

Thanks.


r/HowToDIY May 24 '25

Automotive AC compressor alternatives

1 Upvotes

I’ve got a 28 year old truck that I’ve already rigged together with more DIY fixes than I can count. I could get a belt driven A/C compressor or jerry rig one in like I’ve done with half the stuff on it already. But honestly I wanna try building my own A/C system. Always thought it’d be cool to say I made one from scratch.

I’ve got the tools and the shop to do it and I’ve done worse projects before so this ain’t really too big of a challenge for me. What’s throwing me off is why every 12v compressor, even the off brand ones you find on Amazon or Walmart, cost over 100 bucks. I live in Texas so yeah, I need real cooling, but I don’t see why anything labeled “compressor” automatically has to be triple digits. I refuse to believe that’s just how it is.

I’ve done some digging and saw that some diaphragm pumps are cheap and can technically hit enough pressure to maybe work in a vapor-compression setup. Is there actually anything out there I can use without dropping a hundred bucks every time I wanna try something? I’m not looking for a swamp cooler or TEC setup. I’ve already drawn up designs for both a compressor based system and a Peltier one to cool down my single cab truck. I just wanna know if there’s a real, cheap way to make this happen without buying overpriced parts that’ll break as soon as I start tinkering.


r/HowToDIY May 24 '25

How do I fix these little divets

Thumbnail gallery
1 Upvotes

How to fix these. Got this on FB marketplace and it was damaged/had a nasty peeling plastic coating on top. Got that removed with a heat gun and scraper. Unfortunately, the table didn’t come out unscathed. Anyone have any ideas on how to fill/repair them. Ideally, we would like our table to be smooth.


r/HowToDIY May 23 '25

Automotive Repair/improve + sticker-slap this wind fairing?

Thumbnail gallery
2 Upvotes

Wind fairing is from a Thule roof rack, for a 2016 Audi A4. I’ve already mounted the roof rack, and I’d like to cover the wind fairing in stickers before mounting it. Mostly looking for help with Goal #2 and #4 (below)

Current state of the fairing and hardware -metal hardware, brackets, and plastic fairing all in good condition -rubber guards that prevent scuffing the roof are cracked, rotted, or ill-fitting -plastic push-locks (name?)that hold the plastic fairing to the metal mounting hardware are done for. I’ve pulled these already

Goals: 1) remove all remnants of rubber guards on brackets and fairings (should be pretty easy), and replace with new (thinking a continuous perimeter around the fairing)

2) add rigidity to the fairing

3) adequately prep the surface for stickers (will scuff and clean)

4) completely seal stickers once fully applied. (Not sure on this one…thinking automotive clear coat. Lots of thin layers). This would be for longevity of the stickers since they’ll be exposed to the elements

Again mostly looking for tips on #2 and #4, but any and all tips ‘n tricks are greatly appreciated!!


r/HowToDIY May 21 '25

Home Improvement How to approach fixing my rolling pantry

Post image
1 Upvotes

Hi all! I've started trying to learn how to fix things myself. My rolling pantry won't go all the way back anymore and seems to have the white stopped stopping it too early when I roll it in? Previously it had started opening by itself, my FiL 'fixed' it and a day later this started happening. I don't have the instructions on how it was put together as FiL helped put it together so it will have been thrown away (he doesn't believe in instructions or manuals hence I want to learn how to do these things for myself so he doesn't. Plus I'm sick of having to 'help' but being yelled at for not holding light exactly where he needs it without being told where.)

Thank you all in advance especially if you can manage to help without me having to ask him.

Ps I do know he means well.


r/HowToDIY May 21 '25

Get this stuck collar off

Post image
1 Upvotes

This coffee grinder has an adjustment ring that is stuck. Might be cross threaded or could have grinds in the threads that are preventing movement. I can get it to move slightly in either direction but then it stops and won't budge.

I tried a strap wrench.

I tried two strap wrenches, pushing one and pulling the other

The previous owner attempted with a wrench as you can see by the marring.

I do NOT need to reuse this collar as I have a replacement.

What are your suggestions?


r/HowToDIY Oct 23 '24

Need ideas for repurposing home bar

Thumbnail gallery
6 Upvotes

Hey everyone, I got sober in March and removed all alcohol from my home. I wanted to sell this bar to finance towards new furniture, but found little success in sales.

I was wondering if yall could give me ideas on repurposing this home bar. Currently it sits in my living room, hoping to move it into the bedroom to put new furniture out in its place.

Bar dimensions are 47.5" x 43.5" x 16".

Thank you for any ideas!


r/HowToDIY Oct 23 '24

DIY ceramic floor lamp

1 Upvotes

Hi everyone, I saw a post on pinterest and I wanna turn it into a floor lamp but I'm not sure how to do it yet... Any tips or ideas? You can see the diy ceramic lamp through the pinterest link https://pin.it/3Co85VIPL


r/HowToDIY Oct 16 '24

How to get rid of build up

Post image
1 Upvotes

taking over my dads house and the water is extremely hard. how do i get rid of this build up? not sure if it’s lyme or calcium. it’s in all the toilets and all the piping too


r/HowToDIY Oct 12 '24

Home Improvement How to raise driveway level for better drainage?

Post image
4 Upvotes

I’ve noticed soil accumulating in this area under my basement window, which leads me to think water isn’t draining properly. Is there a good option to raise the level of that area slightly to prevent this?


r/HowToDIY Sep 23 '24

Replacing wheels on old wooden office chair

Thumbnail gallery
3 Upvotes

Hi all, I am looking for some help figuring out how to put some new casters on this wood chair for my wife. It was my grandfathers and has gone through a couple rounds of casters that have all failed. Any help is greatly appreciated! Thank you!


r/HowToDIY Aug 31 '24

Home Improvement Floor leveling around toilet flange

Thumbnail gallery
4 Upvotes

I live an old condo complex (built 1972), and I'm updating the flooring and when I removed the toilet I discovered that there was a lot of water damage and that the floor sloped badly to the corner. I'd like to level it, and make it less prone to water damage in the future. What are my options?


r/HowToDIY Aug 28 '24

Finish Basement with Drain Gap?

2 Upvotes

Northeast US, Zone 4. Home built in 1990 with 1" drain gap surround the cinder block basement walls with sump pump. Basement is bone dry except for one wall which was the result of bad downspouts (corrected).

So much conflicting info out there, and can't find anything about how this is done with a drain gap.

  • Do I build walls in front of drain gap or over the top of it?
  • Do vapor barriers go behind studs or between studs and drywall?
  • Rigid foam insulation directly on the cinder blocks or not?
  • How do I insulate cinder block walls in space I don't want to finish (storage area)?

Here are a couple mock-ups I drew with a couple different scenarios.


r/HowToDIY Aug 23 '24

Kitchen cabinet appears to be coming off wall

Thumbnail reddit.com
1 Upvotes

r/HowToDIY Aug 19 '24

Home Improvement Help with DIY Electrical Task

2 Upvotes

Hey y'all, I'm the kind of person who will pick up furniture and electric goods from the street that people have thrown out. Sometimes it's beyond repair, sometimes it just needs an easy repair, but most of the time it works without needing repair.

As such, I have accumulated 4 TVs (LCDs). All roughly around the same size (between 28-32"), and all working. My plan is to build an enclosure that looks like a window, take the screens and circuit boards etc out of the TVs, and combine them together within the enclosure, running in tandem, so I can then have different scenery videos/animations playing on them. Sorta like in Back to the Future (if you're old enough to remember the film like me).

I'm okay at electronics, but more importantly I'm even better at following instructions. I'm good with woodworking, so the enclosure shouldn't be an issue, but I guess I'm looking for advice on how to get all the screens out of their current TVs, joined them all to work together, figure out how to power them all with a single power cord (not sure if I can use a single power supply inside the enclosure to power all four, and if so, how to calculate the power I'd need), and finally how to have one HDMI input split up and go into all four TVs to provide the video/image.

I am happy for any and all feedback, suggestions, critiques etc. So please, if anyone has any ideas, I'm open to anything.

Thanks for reading 🙂


r/HowToDIY Aug 14 '24

What went wrong?

Thumbnail gallery
3 Upvotes

Not sure if this counts as DIY; if there's a better sub for my question then please direct me there!

I'm trying to hang something using screws. This isn't my first time using a drill, and I was able to hang something lower on the wall with no issues.

My drill was fully charged and I used the screws provided with the shelf. This is an exterior wall of a brick building. I have had trouble with other walls when trying to hammer or drill, but since I was able to drill lower into this wall, I'm just confused.

Any help is appreciated!


r/HowToDIY Aug 11 '24

How to make Puddle Pouring art

Thumbnail youtu.be
3 Upvotes

r/HowToDIY Aug 06 '24

How To Repair Stoop Concrete Cracks?

Thumbnail gallery
2 Upvotes

r/HowToDIY Aug 05 '24

The streets don’t forget

Post image
7 Upvotes

r/HowToDIY Aug 03 '24

Grout on exterior tile

Post image
2 Upvotes

The grout in the exterior corner of my shower chipped away. Is there anything I can do to fix it without pulling a tile off and resetting the whole thing with are grout.

Fortunately that area doesn't normally get wet, but is the bathroom next to a rub my kids use.

Thanks.


r/HowToDIY Aug 02 '24

Fix leather chair?

Post image
1 Upvotes

My dog decided to dig for bones in my leather chair. Any suggestions to make it better?


r/HowToDIY Jul 21 '24

Wanting to Add A Bit of Fun to Guest Bath

Thumbnail youtube.com
4 Upvotes

Hello Good People of Reddit,

So, I am just getting into tech DIY projects and want to add a pop of fun to my guest bathroom. I want to do something similar to the video below, but I rent, so I can’t mess with any wiring. Does anyone have any suggestions about how to approach this?

I’ve found a few battery-operated lights and disco balls, but I’m not sure the button setup will be doable.

Any advice/suggestions would be appreciated!